dam up
英 [dæm ʌp]
美 [dæm ʌp]
壅高;筑坝壅水;挡水
英英释义
verb
- obstruct with, or as if with, a dam
- dam the gorges of the Yangtse River
双语例句
- A typical mud-gravel structure can be seen at the Shuiqiuchi Pool dam, it was piled up by debris flow deposits, and its formation is not related to mountain falling.
水湫池堰塞坝的沉积物具有典型的“泥砾”结构,在形态特征上属于粘性重力流的碎屑流堆积; - Therefore, protective measures for preventing tailing dam breach should be taken from the respects of improving the design of flood control ability, strengthening the stability of the dam and tightening up the management.
因此,预防溃坝的环境风险防护措施,要从防洪设计、增强坝体稳定性及加强管理等方面进行。 - On the basis of the technique of system simulation and the theory of queue stochastic simulation network, the queue network simulation model and the construction process simulation model for high roller compacted concret dam have been set up.
本文根据碾压混凝土坝施工特点,采用计算机系统仿真技术和排队随机仿真网格理论,建立了高碾压混凝土坝施工交通运输系统排队网络仿真模型和高碾压坝施工浇筑过程仿真模型。 - Jack is not such a man as can dam up his feeling.
杰克不是能控制感情的人。 - Whatever happens, you have to dam up your feelings.
无论发生什么,你必须控制住感情。 - They are going to dam up the river to set up a hydropower station.
他们准备拦江筑坝建水电站。 - Thus it is very pressing for us integrating digital asset of TV media better, establishing the theory of digital asset management ( DAM), setting up operation modes and evaluation methods, etc..
因而,对于如何更好的整合电视媒体的数字资产,构建基于数字资产管理(DAM,DigitalAssetManagement)的理论、运营模式及评价方法等,便成为当务之急。 - After the two solutions, in down dam selection it is also under the same technical and economic comparison of the dam with the up dam, finally the concrete arch dams is selected.
在选定这两个方案后也是通过和在上坝址选择过程一样的方法对下坝址进行了技术经济比较,最终选定下坝址以混凝土拱坝为代表坝型。 - The impermeability of the concrete has been greatly improved and leakage of the dam body is decreased up to 1. 88 m3/ h, thus meeting the design requirement.
堰顶横缝表面封堵和混凝土裂缝的化学灌浆处理,增强了混凝土的防渗性能,坝体渗漏量降为1.88m3/h,满足了设计要求。 - The major contents are as follows: ( 1) According to the conservation of energy theory and the heat transfer theory, the heat transfer model of dam leakage is set up through the combination with the conservation energy equation and the heat transfer equation.
根据能量守恒原理、传热学理论,由能量平衡方程及热传导方程联合建立大坝渗漏传热模型。
